top of page

Building Energy Assessments, Solutions, and Technologies BEAST
Hot Water Central Plant
The hot water system consists of one electric boiler with two pumps. There are two water piping configuration options: (1) primary/secondary or (2) primary only configuration. The boiler serves VAV AHU coil, VAV box reheat coils, and three fan coils located in zones. All pumps are equipped with VFDs




Boiler
Pump
bottom of page